Sign in to FlowVella

Forgot password?
Sign in with Facebook

New? Create your account

Sign up for FlowVella

Sign up with Facebook

Already have an account? Sign in now


By registering you are agreeing to our
Terms of Service

Share This Flow

Loading Flow

loading...

Downloading Image /

loading...

Downloading Image /

loading...

Downloading Image /

loading...

~Building of the Future~ The S.H.E.M.A.H.

-In the residential (hotel) part of our B.O.T.F, there are 6 floors with 16 rooms each (96 rooms in total).

-There are 3 business (mall) floors.

-There is 1 lobby floor.

-There is 1 basement (gym/pool) floor.

-All 6 residential floors have a total dead load of approximately 96,624 lbs.

-The lobby's total dead load is approximately 2619.092 lbs.

-The 3 business floors' total dead load is approximately 42,713 lbs.

-The gym/pool part's total dead load is approximately 186,741.6 lbs.

-The total dead load of the walls and structure is approximately 59,815 lbs.

-The total cost of our B.O.T.F, the S.H.E.M.A.H, is approximately$8,621,872.97.

-The total dead load of our B.O.T.F, the S.H.E.M.A.H, is approximately 388,512.1 lbs.

-The total dead load of our B.O.T.F, the S.H.E.M.A.H, is approximately 777,024.2 lbs.

Downloading Image /

loading...

Downloading Image /

loading...

Downloading Image /

loading...

Downloading Image /

loading...
  • 1

  • 2

  • 3

  • 4

  • 5

  • 6

  • 7

B.O.T.F. - The S.H.E.M.A.H.

By hhaley17

Engineering Project: Building of the Future - The S.H.E.M.A.H. Mar. 2014