Sign up for FlowVella
Sign up with FacebookAlready have an account? Sign in now
By registering you are agreeing to our
Terms of Service
Loading Flow
Decapsulation & Die Verification
Laboratory Process Guide 2023
DECAPSULATION & DIE VERIFICATION
Die Verification
Equipment: Keyence VHX-7000 Microscopes
Destructive?: Yes (Already decapsulated)
Duration: PR9 30mins – AS6081 1hr
Description: The last stage of testing follows
on from Decapsulation. Now, the die will be
placed on a microscope where the Technician will manually scan across it at magnifications ranging from 20x to 6000x.
A key part of this testing is verifying consistency throughout all sampled dies in a
batch and checking that the markings are
the same as historical, archived inspections.
16