Sign up for FlowVella
Sign up with FacebookAlready have an account? Sign in now
By registering you are agreeing to our
Terms of Service
Loading Flow
Solderability Testing
Laboratory Process Guide 2023
SOLDERABILITY TESTING
Solderability
Dip & Look
Equipment:
Gen3 MUST3 Solderability Machine
Destructive?: Yes
Duration: PR9 10 mins – AS6081 30 mins
Description: For non-leaded package types (see glossary for package types).
The part will be held in a clamp and then submerged in a bath of molten solder for 10 seconds before pulling it out and cleaning it up. The component will then be inspected with a microscope and assessed for how well the solder has adhered to the terminations.
This test is conducted to ensure that when
the devices reach production there will not
be any issues soldering them to the board.
09